Monday, February 25, 2008

PIERS


Well the house is starting to come along. However there has been a lot of rain up here lately and with our soil in the subdivision, it is a pain to get anything done after it rains. Due to the soils report on my home, we are putting in 45 piers measuring 1ft in diameter with rebar and at a depth of 15 ft. It is always pretty cool watching these machines work. The guy on the left is like the servant helper (he really doesn't do much). The plumbing rough inspection is today and then they should start making up the foundation so we can pour later this week. Then the house should start flying up.

No comments: